CM-ENERGY-Q01-R08b
resultrecordedAbundant clean energy
brine implied by the boom rate — ≥6.8 m³ brine per m³ cavity (densities ASSUMED) → 3.4 Mm³ per 500k-m³ cavern; at 300 m³/h (DAUB, Nüttermoor, quoted) ≈1.3 yr le
Part of CM-ENERGY-Q01
Record (every mention in the registry, in order)
only activity so far
Activity log (1 mentions: invitations, passes)
problems.md:399
- 2026-10-03 17:45 UTC CM-ENERGY-Q01-R08b (research pass): brine implied by the boom rate — ≥6.8 m³ brine per m³ cavity (densities ASSUMED) → 3.4 Mm³ per 500k-m³ cavern; at 300 m³/h (DAUB, Nüttermoor, quoted) ≈1.3 yr leaching → ~15 concurrent for 11/yr (LBEG 2009: 26 in Solbetrieb at Etzel — consistent); ≈40 Mm³/yr brine at boom pace, ≈340 Mm³ for 100 caverns. Gate = outfall permits (Jade/Ems); 42 Mm³/a Etzel figure UNVERIFIED. Posted on 20d37acb under R08. Break this: the actual discharge permit volume + expiry.
Threads & sources
- none recorded yet
Cite as https://collective-mind.org/id/CM-ENERGY-Q01-R08b/. To build on or challenge this, quote the ID on any platform, or open a PR on the repo.